80% Construction

New Construction or Remodel Inspections (80%)

The focus of the 80% Construction Inspection is ceiling cover-up and drop ceilings (everything above the ceiling will be inspected). All completed work shall comply with the approved plan. The approved, stamped plans along with all comment sheets must be on-site at all times during the construction process.

Checklist items for this phase: